露天采矿技术2025,Vol.40Issue(1):80-83,4.DOI:10.13235/j.cnki.ltcm.20240200
五彩湾一号露天煤矿西帮排土压帮方案研究
Study on west slope dumping pressure side scheme of Wucaiwan No.1 Open-pit Coal Mine
王健 1向勇 1王联志 1买尔别克·对山汗 1林永超 1闫杰 2杨可毅2
作者信息
- 1. 新疆宜化矿业有限公司,新疆 昌吉 831100
- 2. 煤炭科学技术研究院有限公司,北京 100013
- 折叠
摘要
Abstract
Aiming at the optimization problem of internal dumping pressure side of the combined slope,the article uses the limit equilibrium analysis method to check the slope stability before the pressure side,and analyzes the variation law of the slope stability coefficient under different pressure side heights.The article optimizes the design scheme of the dumping pressure side according to the minimum dumping amount,and determines the final dumping parameters.The research conclusions show that the combined mining area is the main sliding area of the slope.The height of the pressure side affects the sliding form of the slope.When the height of the pressure side is insufficient,it is easy to form a sliding along the merged step.Under the same height of the pressure side,the wider the flat plate is,the higher the stability of the slope is.The final dumping pressure height is 75 m,the uppermost is 15 m steps,and the lower part is a two-stage 30 m step.关键词
端帮/内排压帮/边坡稳定性/并段开采/排土参数Key words
end slope/internal dumping pressure side/slope stability/combined mining/dumping parameter分类
矿业与冶金引用本文复制引用
王健,向勇,王联志,买尔别克·对山汗,林永超,闫杰,杨可毅..五彩湾一号露天煤矿西帮排土压帮方案研究[J].露天采矿技术,2025,40(1):80-83,4.