| 注册
首页|期刊导航|煤矿安全|煤层气井排采中断后恢复模式对支撑裂缝内煤粉运移的影响

煤层气井排采中断后恢复模式对支撑裂缝内煤粉运移的影响

毛崇昊 皇凡生 胡秋嘉 刘世奇 张聪 雷兴龙

煤矿安全2025,Vol.56Issue(2):58-66,9.
煤矿安全2025,Vol.56Issue(2):58-66,9.DOI:10.13347/j.cnki.mkaq.20231783

煤层气井排采中断后恢复模式对支撑裂缝内煤粉运移的影响

Influence of recovery model of coalbed methane wells after drainage interruption on coal fines migration in propped fractures

毛崇昊 1皇凡生 2胡秋嘉 1刘世奇 2张聪 1雷兴龙1

作者信息

  • 1. 中国石油天然气股份有限公司 山西煤层气勘探开发分公司,山西 长治 046000
  • 2. 中国矿业大学 江苏省煤基温室气体减排与资源化利用重点实验室,江苏 徐州 221008||中国矿业大学 碳中和研究院,江苏 徐州 221008
  • 折叠

摘要

Abstract

In the drainage process of coalbed methane well,the interruption of drainage will induce a large amount of coal fines to stay in propped fractures,causing damage to the permeability of propped fractures.Based on the solid-liquid two-phase flow and gas-liquid-solid three-phase flow two patterns,experiments were carried out to investigate the effect of recovery mode after drainage in-terruption on coal fines migration in propped fractures.The permeability evolution law of propped fractures under the one-stage re-covery mode and step-by-step recovery mode was compared,and the mechanism of coal fines migration under different recovery modes was revealed.The results show that the one-stage recovery mode can increase the permeability of propped fractures above the pre-interruption level under the condition of solid-liquid two-phase flow,but the step-by-step recovery mode is difficult to restore the permeability of propped fractures to the pre-interruption level.Under the condition of gas-solid-liquid three-phase flow,both the one-sta-ge recovery mode and the step-by-step recovery mode can increase the permeability of gas phase and liquid phase beyond the pre-inter-ruption levels,and the one-stage recovery mode presents a better improvement effect than the step-by-step recovery mode.Under the conditions of solid-liquid two-phase flow and gas-liquid-solid three-phase flow,the retention forms of coal fines in propped fractures are mainly solid-liquid interface and gas-liquid interface adhesion,which is the main reason for the different improvement effects of the permeability of propped fracture under a same recovery mode.The flow rate amplification of the first-stage recovery mode is much greater than that of the step-by-step recovery mode,resulting in greater wall shear stress and stronger gas-liquid interface disturbance effects.As a result,the promotion and discharge effect on retained coal fines is stronger,and the improvement effect on permeability is better.During the stages of single-phase water drainage and gas-water joint drainage,in order to suppress the impact of drainage in-terruption on the permeability of propped fractures,the first-stage recovery mode should be adopted after the interruption of drainage.

关键词

煤层气/煤粉运移/支撑裂缝/排采中断/排采恢复

Key words

coalbed methane/coal fines migration/propped fracture/drainage interruption/drainage recovery

分类

矿山工程

引用本文复制引用

毛崇昊,皇凡生,胡秋嘉,刘世奇,张聪,雷兴龙..煤层气井排采中断后恢复模式对支撑裂缝内煤粉运移的影响[J].煤矿安全,2025,56(2):58-66,9.

基金项目

国家自然科学基金资助项目(42002182,42372184) (42002182,42372184)

煤矿安全

OA北大核心

1003-496X

访问量4
|
下载量0
段落导航相关论文