智能城市2024,Vol.10Issue(12):54-57,4.DOI:10.19301/j.cnki.zncs.2024.12.016
数据中心市电电源和备用电源的切换控制逻辑研究
Research on switching control logic of mains and backup power sources in data centers
陈益鑫1
作者信息
- 1. 福建省数字福建云计算运营有限公司,福建 福州 350000
- 折叠
摘要
Abstract
The data center is an important infrastructure for data operation.In recent years,data information has grown exponentially,and equipment power consumption is enormous.Therefore,diesel generator sets need to be used as backup power sources to switch between mains power and backup power,ensuring the normal operation of data center services.The paper takes a data center renovation project as an example,focusing on the switching control logic of its mains power supply and backup power supply.The analysis is conducted from the aspects of diesel generator parallel system,mains power switching PLC control system,mains power supply and diesel generator system switching control logic,switching control logic between mains high and low voltage power supply,interlocking requirements,etc.It is expected to provide a reference for similar projects.关键词
数据中心/市电电源/备用电源/切换控制逻辑Key words
data center/municipal power supply/backup power supply/switching control logic分类
信息技术与安全科学引用本文复制引用
陈益鑫..数据中心市电电源和备用电源的切换控制逻辑研究[J].智能城市,2024,10(12):54-57,4.