首页|期刊导航|传感技术学报|基于遗传算法的边缘光纤传感网动态资源调度策略

基于遗传算法的边缘光纤传感网动态资源调度策略

赵俊 谢岩 苏轩 朱彦霖 罗曦 严敏 甘战 侯云川 常嘉瑞

传感技术学报2025,Vol.38Issue(1):82-87,6.
传感技术学报2025,Vol.38Issue(1):82-87,6.DOI:10.3969/j.issn.1004-1699.2025.01.010

基于遗传算法的边缘光纤传感网动态资源调度策略

Dynamic Resource Scheduling Strategy of Edge Optical Fiber Sensor Network Based on Genetic Algorithm

赵俊 1谢岩 2苏轩 2朱彦霖 2罗曦 3严敏 3甘战 3侯云川 3常嘉瑞4

作者信息

  • 1. 淮阴工学院电子信息工程学院,江苏 淮安 223003||东南大学光传感/通信综合网络国家地方联合工程研究中心,江苏 南京 210096
  • 2. 淮阴工学院电子信息工程学院,江苏 淮安 223003
  • 3. 中国南方电网有限责任公司超高压输电公司曲靖局,云南 曲靖 655000
  • 折叠

摘要

Abstract

A distributed edge fiber sensing system(AOPS-WDM-DEFSS)scheme based on asynchronous optical packet switching and wavelength division multiplexing technology is proposed,which can support the switching and transmission requirements of massive,het-erogeneous,and burst sensing services in edge computing scenarios.Based on the service characteristics of the edge side of AOPS-WDM-DEFSS,a dynamic resource and task scheduling strategy for edge computing clusters using genetic algorithms is proposed.The dynamic resource scheduling cluster model and task model are established,and the three optimization objective functions of completion time(T),communication load(L)and usage cost(C)are defined,and the effects of task number(n),task relevance(REV),transmission processing speed ratio(RAT),and weights(α,β and γ)on the objective function are simulated.The results show that when n increases to 50,T,L and C increase to 15.11 s,641 MB and ¥443.2,respectively.When REV increases to 5,T and L increase to 20.1 s and 1 932 MB,respectively.When RAT increases to 25,T and L increase to 11.4 s and 1 724 MB,respectively.After α,β and γ reach 0.8 and 0.9,respectively,the normalized values of T,L and C tend to 1.

关键词

光纤传感网/边缘计算/分布式/遗传算法/动态资源调度

Key words

optical fiber sensor network/edge computing/distributed/genetic algorithms/dynamic resource scheduling

分类

信息技术与安全科学

引用本文复制引用

赵俊,谢岩,苏轩,朱彦霖,罗曦,严敏,甘战,侯云川,常嘉瑞..基于遗传算法的边缘光纤传感网动态资源调度策略[J].传感技术学报,2025,38(1):82-87,6.