电力系统自动化2025,Vol.49Issue(3):42-59,18.DOI:10.7500/AEPS20231225005
港口岸电系统部署规划技术与运营方法综述
Review on Deployment Planning Techniques and Operational Methods for Port Shore Power System
摘要
Abstract
Shore power systems reduce the emission of port area by shutting down the power generation equipment of docked ships,and is the central equipment of port energy-transportation integration.Its operation and planning play an important role in realizing the goal of"carbon neutrality"in the future port integrated energy system.In order to clarify the current research status and point out the bottleneck problems restricting the development of shore power systems,the port shore power system is reviewed from three aspects:environmental benefit assessment,technical standards and deployment schemes of shore power systems,policy planning and operation strategies of shore power systems.The analysis shows that the shore power system plays a key role in port green development,but the installation rate and utilization rate of shore power system present a great contradiction.In view of the future development of shore power system,three future development priorities are proposed,namely,the whole life cycle planning of shore power,the energy-transportation integration management of shore power system,and the multi-agent operation management of shore power system.关键词
岸电系统/港口/碳减排/能源-交通融合/环境效益/可再生能源Key words
shore power system/port/carbon emission reduction/energy-transportation integration/environmental benefit/renewable energy引用本文复制引用
戴磊,王玉冰,郭思清,胡昊,方斯顿..港口岸电系统部署规划技术与运营方法综述[J].电力系统自动化,2025,49(3):42-59,18.基金项目
国家自然科学基金资助项目(72004132) (72004132)
上海市"科技创新行动计划"软科学项目(23692111100). This work is supported by National Natural Science Foundation of China(No.72004132)and Shanghai Soft Science Project of Science and Technology Innovation Action Plan(No.23692111100). (23692111100)