| 注册
首页|期刊导航|广东水利水电|新韶水文站泥沙间测可行性探索

新韶水文站泥沙间测可行性探索

黄永

广东水利水电Issue(2):38-43,6.
广东水利水电Issue(2):38-43,6.

新韶水文站泥沙间测可行性探索

Feasibility Study of intermittent Measuring Suspended Load Discharge of Xinshao Hydrological Station

黄永1

作者信息

  • 1. 广东省水文局韶关水文分局,广东 韶关 512026
  • 折叠

摘要

Abstract

In view of the influence of Wantou Water Control Project at the downstream,Xinshao Hydrologic Station will be built 10 kilometers away downstream at Changba Station.At present,various tests have been carried out in Xinshao Station.Based on the monitoring data of Xinshao Hydrologic Station from 2013 to 2020 for 8 years,combined with key indicators of single samples,average sediment concentration of sectios and water level amplitude,the stability and error range of sediment law of Xinshao Hydrologic Station are analyzed by mathematical statistics method.The purpose of this study is to explore the feasibility of inter-test,to optimize the test process,to improve the monitoring efficiency,and to provide valuable reference for similar stations.

关键词

新韶水文站/泥沙监测/输沙率

Key words

Xinshao Hydrometric Station/sediment monitoring/sediment transport rate

分类

天文与地球科学

引用本文复制引用

黄永..新韶水文站泥沙间测可行性探索[J].广东水利水电,2025,(2):38-43,6.

广东水利水电

1008-0112

访问量0
|
下载量0
段落导航相关论文