摘要
Abstract
The traditional preventive maintenance(PM)optimization of nuclear power plants mainly relies on the personnel maintenance experience and operation experience,lacking of scientific failure prediction,maintenance cycle and maintenance window evaluation,which weakens the effectiveness of maintenance.The failure probability analysis and quantitative supervision techniques for maintenance was introduced by maintenance rule.By quantitatively evaluating the reliability and availability of equipment,PM effectiveness is evaluated,providing the accurate optimization basis for the PM items and cycles under different objectives are available.The maintenance rule was combined with PM optimization in one domestic nuclear power plant,which not only achieves a proper balance between reliability and availability,but also effectively supports the reducing of PM items during outage.The result of optimum practice shows that so it can be popularized and applied to the other nuclear power plants.关键词
维修有效性评价/预防性维修优化/量化评价/失效预测/维修窗口评价Key words
maintenance rule/preventive maintenance optimization/quantitative evaluation/failure prediction/maintenance window evaluation分类
信息技术与安全科学引用本文复制引用
韩伟,陈秀娟..维修有效性评价在核电厂预维优化中的应用实践研究[J].核安全,2025,24(1):43-52,10.