天津建设科技2025,Vol.35Issue(1):33-37,5.DOI:10.3969/j.issn.1008-3197.2025.01.009
城市复杂环境下暗挖地铁车站综合降水方案研究
Study on Multiple Schemes of Dewatering of Metro in Complex Urban Environment
田锦明 1王成雷 1程科 1朱宝玲1
作者信息
- 1. 中铁第六勘察设计院集团有限公司,天津 300308
- 折叠
摘要
Abstract
In view of traditional surface pipe well dewatering construction of underground stations is affected by complex conditions,so it is difficult to implement or form closed dewatering conditions,taking a underground station of Beijing Metro as an example,through a refined analysis of the station's surrounding environmental condi-tions and engineering geological and hydrogeological conditions,the comprehensive dewatering schemes such as pilot tunnel dewatering wells,unilateral decompression dewatering,and inclined well point dewatering de-watering are adopted to treat the groundwater.关键词
地铁/暗挖车站/地下水/导洞降水Key words
metro/underground excavation station/groundwater/dewatering in pilot tunnel分类
建筑与水利引用本文复制引用
田锦明,王成雷,程科,朱宝玲..城市复杂环境下暗挖地铁车站综合降水方案研究[J].天津建设科技,2025,35(1):33-37,5.