铁路通信信号工程技术2025,Vol.22Issue(2):110-115,6.DOI:10.3969/j.issn.1673-4440.2025.02.017
线网既有信号系统改造规划思考
Reflection and Planning of Retrofitting of Existing Signaling Systems in Line Networks
于波 1王文龙 2孟洋3
作者信息
- 1. 北京市地铁运营有限公司,北京 100044
- 2. 铁科华铁经纬(天津)信息技术有限公司,天津 301700
- 3. 北京全路通信信号研究设计院集团有限公司,北京 100070||列车自主运行智能控制铁路行业工程研究中心,北京 100070
- 折叠
摘要
Abstract
For the development of urban rail transit,how the retrofitting planning can be more economical and reasonable and effectively meet the needs of normal operation and operational use of the lines has become a new problem.This paper focuses on the signaling system of existing lines,and combines various current Chinese standards and specifications,line network planning,and actual operating conditions of various lines to classify the retrofitting works and summarize the directions and ideas for retrofitting planning,providing reference and guidance for the retrofitting planning of signaling systems of existing lines.关键词
既有线路/信号系统/改造规划Key words
existing line/signaling system/retrofitting planning分类
交通工程引用本文复制引用
于波,王文龙,孟洋..线网既有信号系统改造规划思考[J].铁路通信信号工程技术,2025,22(2):110-115,6.