煤矿深部巷道大变形分步联合控制研究

李培涛 刘泉声 朱元广 高峰 范利丹

岩土力学2025,Vol.46Issue(2):591-612,22.
岩土力学2025,Vol.46Issue(2):591-612,22.DOI:10.16285/j.rsm.2024.0147

煤矿深部巷道大变形分步联合控制研究

Combined support method for large deformation of deep coal mine tunnel

李培涛 1刘泉声 2朱元广 3高峰 2范利丹4

作者信息

  • 1. 河南理工大学 土木工程学院,河南 焦作 454003||武汉大学 土木建筑工程学院,湖北 武汉 430072
  • 2. 武汉大学 土木建筑工程学院,湖北 武汉 430072
  • 3. 中国科学院武汉岩土力学研究所 岩土力学与工程国家重点实验室,湖北 武汉 430071
  • 4. 河南理工大学 土木工程学院,河南 焦作 454003
  • 折叠

摘要

Abstract

Large deformations in deep tunnels pose a significant challenge to safe and efficient mining.To control the stability of deep soft surrounding rock,a combined support method and its theoretical analysis model were proposed,based on the evolution of large deformation in deep tunnels.Results indicated that deep soft surrounding rock can be categorized into fracture deformation,damage and expansion deformation,and continuous deformation zones.Following the implementation of combined support measures,the ultimate bearing capacity increased linearly with the equivalent support forces of anchor rods and cables and exponentially with the grouting reinforcement coefficient.The parameters for pre-stressed bolts and cables should be determined based on bearing balance conditions when the grouting reinforcement coefficient is 1.0.Both the grouting reinforcement coefficient and the fracture zone radius of surrounding rock should be considered in the design of grouting support for deep and shallow holes.Collaborative support parameters for various support measures were determined by the ultimate bearing capacity balance conditions of the surrounding rock in the reinforced fracture zone.Numerical simulation and engineering application analysis demonstrated that the large deformation of deep soft surrounding rock can be controlled through the collaborative control of support structures.The combined support method can be widely applied in other tunnel engineering projects.

关键词

深部软弱围岩/大变形/分步联合支护/承载平衡/协同控制

Key words

deep soft rock/larger deformation/combined support method/bearing capacity balance/collaborative control

分类

矿业与冶金

引用本文复制引用

李培涛,刘泉声,朱元广,高峰,范利丹..煤矿深部巷道大变形分步联合控制研究[J].岩土力学,2025,46(2):591-612,22.

基金项目

国家自然科学基金(No.U21A20153,No.52208244). This work was supported by the National Natural Science Foundation of China(U21A20153,52208244). (No.U21A20153,No.52208244)