海边软土地基直埋大口径输水管道沉降数值分析与监测

刘安荣

电力勘测设计Issue(2):72-78,7.
电力勘测设计Issue(2):72-78,7.DOI:10.13500/j.dlkcsj.issn1671-9913.2025.02.013

海边软土地基直埋大口径输水管道沉降数值分析与监测

Numerical Analysis and Monitoring of Settlement of Directly Buried Large Diameter Water Pipeline in Seaside Soft Soil

刘安荣1

作者信息

  • 1. 中国电建集团河北省电力勘测设计研究院有限公司,河北 石家庄 050031||河北省电力勘测设计技术创新中心,河北 石家庄 050031
  • 折叠

摘要

Abstract

The long-distance large-diameter water pipeline directly buried on the soft soil is sensitive to settlement due to its flexibility.The uneven settlement of the foundation leads to the change of the stress state of the pipeline,which is easy to cause leakage damage of the pipeline.In this paper,the finite element software PLAXIS 2D is used to simulate and analyze the settlement of the foundation of the directly buried circulating water pipeline in a seaside power plant under the additional load of 3 m high fill.According to the settlement amount,the directly buried pipeline is proposed.The two ends are blocked and the pipe is filled with water.After one year of consolidation settlement,the consolidation settlement of the pipeline is more than 90%.When the residual settlement is small,the two ends of the pipeline are respectively connected to the main plant and the aeration tank,and the settlement process is monitored on site.The results show that the settlement monitoring value is close to the finite element calculation result,and the trend is consistent.After the project is put into operation for two years,the pipeline has not experienced leakage damage,which meets the expected requirements.The cost of foundation treatment is greatly reduced.

关键词

海边软土地基/直埋大口径输水管道/固结沉降/有限元分析/沉降监测

Key words

seaside soft soil/directly buried large-diameter water pipeline/consolidation settlement/finite element analysis/settlement monitoring