| 注册
首页|期刊导航|钢管|长江盾构穿越工程用厚壁大直径18m UOE焊管的开发

长江盾构穿越工程用厚壁大直径18m UOE焊管的开发

谢仕强 侯杰廷 章传国 钟桂香

钢管2025,Vol.54Issue(1):26-32,7.
钢管2025,Vol.54Issue(1):26-32,7.DOI:10.19938/j.steelpipe.1001-2311.2025.1.26.32

长江盾构穿越工程用厚壁大直径18m UOE焊管的开发

Development of Heavy Wall Large-sized 18 m UOE Welded Pipe for Yangtze River Shield Crossing Project

谢仕强 1侯杰廷 2章传国 1钟桂香3

作者信息

  • 1. 宝山钢铁股份有限公司,上海 201900||油气钻采输送装备全国重点实验室,上海 201900
  • 2. 国家石油天然气管网集团有限公司建设项目管理分公司,河北 廊坊 065001
  • 3. 中国石油天然气管道工程有限公司,河北 廊坊 065002
  • 折叠

摘要

Abstract

Described here in the article are the general situation and main technical requirements of the Yangtze Ri-ver Shield Crossing Project,focusing on the performance characteristics of the API Spec 5L X80 Φ1 422 mm×32.1 mm UOE 18 m elongated SAWL steel pipe as developed by Baosteel for said the project with the integrated manufacturing techno-logy.It is revealed via the analysis that the X80 steel pipe has ultra-low C content,high Mn and Nb content,fine micro-structure,high strength and toughness,and good weldability,which meets the requirements by the project.The successful development and application of the above mentioned elongated steel pipe have filled the gap of the extra heavy and extra long X80 large-sized UOE SAWL steel pipe for river-crossing tunnel projects both at home and abroad.

关键词

直缝埋弧焊钢管/X80钢级/UOE/加长管/长江盾构穿越工程

Key words

SAWL steel pipe/X80/UOE/elongated pipe/Yangtze River Shield Crossing Project

引用本文复制引用

谢仕强,侯杰廷,章传国,钟桂香..长江盾构穿越工程用厚壁大直径18m UOE焊管的开发[J].钢管,2025,54(1):26-32,7.

钢管

1001-2311

访问量1
|
下载量0
段落导航相关论文