江西建材Issue(12):333-336,4.
超长混凝土结构温度应力分析及裂缝控制措施分析
Analysis of Temperature Stress and Crack Control Measures of Super-long Concrete Structure
何沙沙1
作者信息
- 1. 福建陆度建设有限公司,福建 福州 350001
- 折叠
摘要
Abstract
Temperature change and shrinkage are the main causes of cracking of super-long concrete.The influence of temperature difference and closing time of post-cast belt on super long concrete structure is analyzed by using finite element software,and other effective measures to control temperature cracks are introduced.The results show that the greater the temperature difference,the greater the temperature stress of basement roof;Temperature cracks are more likely to appear in the long direction of the structure under the influence of temperature difference.It is an effective measure to control the temperature and crack shrinkage of super long concrete structures to set up the post pouring belt.关键词
超长混凝土结构/温度效应/裂缝控制措施Key words
Super long concrete structure/Temperature effect/Crack control measure分类
建筑与水利引用本文复制引用
何沙沙..超长混凝土结构温度应力分析及裂缝控制措施分析[J].江西建材,2024,(12):333-336,4.