| 注册
首页|期刊导航|江西建材|地下室大体积混凝土跳仓分块施工技术探析

地下室大体积混凝土跳仓分块施工技术探析

刘佳鑫

江西建材Issue(12):362-364,3.
江西建材Issue(12):362-364,3.

地下室大体积混凝土跳仓分块施工技术探析

Analysis on the Construction Technology of Mass Concrete Jumping Bin in Basement

刘佳鑫1

作者信息

  • 1. 中建八局第一建设有限公司,山东 济南 250000
  • 折叠

摘要

Abstract

In order to study the construction technology of bin hopping method for mass concrete,this paper takes a very large public building project as an example,analyzes the application of bin hopping method in mass concrete construction,discusses its advantages and effects in controlling temperature cracks and shrinking cracks,and puts forward the key technical points such as the design of post-pouring belt,concrete pouring maintenance and temperature control measures.The results show that the use of bin hopping method can further improve the tensile properties of concrete and the durability of the whole structure,which has important theoretical and practical significance for promoting the de-velopment and construction of underground space.

关键词

大体积混凝土/裂缝防控/跳仓法施工/结构设计

Key words

Mass concrete/Crack prevention and control/Construction by jumping warehouse/Structural design

分类

建筑与水利

引用本文复制引用

刘佳鑫..地下室大体积混凝土跳仓分块施工技术探析[J].江西建材,2024,(12):362-364,3.

江西建材

1006-2890

访问量0
|
下载量0
段落导航相关论文