When carrying out large-diameter pipe jacking construction under soft soil geological conditions,it is crucial to scientifically select the type of pipe jacking machine.This not only ensures construction safety and quality,but also effectively shortens the construction period and reduces overall costs.The article combines specific engineering cases to deeply analyze the entire process of pipe jacking construction,inclu-ding workflow,key construction control points,analysis and optimization of jacking technical parameters,as well as response strategies for con-struction difficulties and challenges.The aim is to provide valuable practical experience and reference for similar projects,and to assist in the technological progress and development of the industry.关键词
大管径顶管/控制要点/工后沉降Key words
Large pipe diameter pipe jacking/Control points/Settlement after work分类