| 注册
首页|期刊导航|水力发电|考虑渗漏发展的多期次时移高密度电法模拟探测分析

考虑渗漏发展的多期次时移高密度电法模拟探测分析

朱丽伟 王海军 潘建伍 赵新铭 汪云飞

水力发电2025,Vol.51Issue(3):37-43,77,8.
水力发电2025,Vol.51Issue(3):37-43,77,8.

考虑渗漏发展的多期次时移高密度电法模拟探测分析

Simulation Detection Analysis of Multi-period Time-lapse High-density Resistivity Method Considering Leakage Development

朱丽伟 1王海军 2潘建伍 3赵新铭 3汪云飞4

作者信息

  • 1. 南京航空航天大学民航学院,江苏 南京 211106||南京水利科学研究院,江苏 南京 210029
  • 2. 南京水利科学研究院,江苏 南京 210029
  • 3. 南京航空航天大学民航学院,江苏 南京 211106
  • 4. 河海大学岩土力学与堤坝工程教育部重点实验室,江苏 南京 210098
  • 折叠

摘要

Abstract

Leakage is one of the common hidden dangers of earth-rock dams,and precise detection research on it is of great significance.To address the issues of insufficient accuracy in current detection methods and difficulty in monitoring dynamic changes in leakage,a new simulation detection method based on time-lapse high-density electrical method considering leakage development and seepage analysis is proposed.At the same time,to address the noise interference in actual detection,Gaussian noise is added to the simulated detection using Python programming,and the impact of random noise on time-lapse inversion results and measures to reduce noise impact are explored in depth.The research results indicate that,(a)the dynamic response characteristics such as the scale,shape,and numerical changes of the relatively low-resistivity anomaly variation zones in the multi-stage time-lapse inversion results can effectively reflect the dynamic evolution trend of leakage hazards;(b)noise may lead to false anomaly zones,which can be distinguished based on changes in anomaly response characteristics and positional correspondence between multiple stages;and(c)the time-lapse inversion before the occurrence of leakage,as the initial detection,shows significant advantages in reducing the number of false anomaly variation zones and mitigating noise impact compared to the situation after the occurrence of leakage.This study not only systematically analyzes the changes in the detection image patterns of the time-lapse high-density electrical method during the multi-stage detection of leakage development,but also provides valuable insights into reducing the impact of noise on detection results.

关键词

土石坝/渗漏隐患/高密度电法/多期次时移探测

Key words

earth-rock dam/hidden danger of leakage/high-density resistivity method/multi-period time-lapse detection

分类

水利科学

引用本文复制引用

朱丽伟,王海军,潘建伍,赵新铭,汪云飞..考虑渗漏发展的多期次时移高密度电法模拟探测分析[J].水力发电,2025,51(3):37-43,77,8.

基金项目

国家重点研发计划专项资助项目(2021YFC3090100,2020YFC1511901) (2021YFC3090100,2020YFC1511901)

水力发电

0559-9342

访问量0
|
下载量0
段落导航相关论文