| 注册
首页|期刊导航|医疗卫生装备|新型帐篷医院系统手术模块展开与撤收标准化操作方案探讨

新型帐篷医院系统手术模块展开与撤收标准化操作方案探讨

苏增标 裴彬宏 许二祥 陈海莺 陈佳娜 潘锦燊 黄艺峰 徐谦

医疗卫生装备2025,Vol.46Issue(2):74-79,6.
医疗卫生装备2025,Vol.46Issue(2):74-79,6.DOI:10.19745/j.1003-8868.2025032

新型帐篷医院系统手术模块展开与撤收标准化操作方案探讨

Standardized scheme for deploying and withdrawing surgical module of new-type tent hospital system

苏增标 1裴彬宏 1许二祥 2陈海莺 3陈佳娜 4潘锦燊 5黄艺峰 6徐谦7

作者信息

  • 1. 联勤保障部队第910医院麻醉科,福建泉州 362000
  • 2. 联勤保障部队第910医院疾病预防控制科,福建泉州 362000
  • 3. 联勤保障部队第910医院护理部,福建泉州 362000
  • 4. 联勤保障部队第910医院眼科,福建泉州 362000
  • 5. 联勤保障部队第910医院信息科,福建泉州 362000
  • 6. 联勤保障部队第910医院医学影像科,福建泉州 362000
  • 7. 联勤保障部队第910医院骨科,福建泉州 362000
  • 折叠

摘要

Abstract

Objective To explore the scheme for the deployment and withdrawal of the surgical module of the new-type tent hospital system.Methods A set of standardized scheme for deploying and withdrawing the surgical module of the new-type tent hosital system was proposed and implemented in terms of labor division,operation precedure,operation technique and precaution.The operating time,number of operational errors and number of equipment damages were recorded for each of the five deployment and withdrawal operations before and after the program was executed,and the team members'immediate heart rate,percentage of maximum heart rate(MHR)and rating of perceived exercise(RPE)at the end of the operation were recorded after the program was implemented.SPSS 26.0 software was used for statistical analysis.Results The standardized scheme had the deployment time shortened from(85.15±11.430)min to(58.23±8.513)min,withdrawal time decreased from(65.36±9.369)min to(48.92±7.129)min,with the differences being statistically significant(P<0.05);the numbers of operatio-nal errors and equipment damages were both reduced when compared with those before the implementation of the schemce;the immediate heart rate of the team members at the end of the operation ranged from 43 to 157 beats/min,with an average value of 151.1 beats/min,the individual MHR percentages were from 75%to 87%,with an average value of 81.1%,and the RPE scores were from 14 to 17,with an average value of 15.3,which all could be categorized as moderate-operation intensity.Condusion The standardized deployment and withdrawal scheme for the surgical module meets the needs of actual combat and training assessment,and thus is worthy promoting in medical institutions equipped with the surgical module of the new-type tent hosital system.[Chinese Medical Equipment Journal,2025,46(2):74-79]

关键词

新型帐篷医院系统/手术模块/展开与撤收/标准化操作方案

Key words

new-type tent hospital system/surgical module/deployment and withdrawal/standardized operation scheme

分类

基础医学

引用本文复制引用

苏增标,裴彬宏,许二祥,陈海莺,陈佳娜,潘锦燊,黄艺峰,徐谦..新型帐篷医院系统手术模块展开与撤收标准化操作方案探讨[J].医疗卫生装备,2025,46(2):74-79,6.

基金项目

军队科研项目(CWX22J003) (CWX22J003)

医疗卫生装备

1003-8868

访问量0
|
下载量0
段落导航相关论文