云南冶金2025,Vol.54Issue(1):28-33,6.
大直径深孔采场破碎顶板支护方案优化研究
Optimization Study of Broken Roof Retaining and Protecting Scheme for Large Diameter Deep Holes Stope
罗正良 1李凡 1赵亮 1董思军 1刘几上2
作者信息
- 1. 云南黄金矿业集团股份有限公司,云南 昆明 650200||保山金厂河矿业有限公司,云南保山 678300
- 2. 云南黄金矿业集团股份有限公司,云南 昆明 650200||云南地矿建设工程有限责任公司,云南 昆明 650200
- 折叠
摘要
Abstract
Technical difficulties such as continuous crushing,unstable collapsing,and resource overlaying affect the roof surrounding rock of the large diameter deep hole stope in Jinchanghe polymetallic ore.To address the mentioned issues,an optimal design for an industrial test of a roof retention and protection system was developed for the 29# stope.On-site applications indicate that this retaining and protective structure can withstand changes in mining stress,effectively controlling roof deformation and providing improved anchoring performance.关键词
两步骤采场/破碎顶板/顶板支护/数值模拟Key words
two-steps stope/broken roof/roof retaining and protecting/numerical modeling分类
矿业与冶金引用本文复制引用
罗正良,李凡,赵亮,董思军,刘几上..大直径深孔采场破碎顶板支护方案优化研究[J].云南冶金,2025,54(1):28-33,6.