首页|期刊导航|中国电机工程学会电力与能源系统学报(英文版)|Restoration of High-renewable-penetrated Distribution Systems Considering Uncertain Repair Workloads
中国电机工程学会电力与能源系统学报(英文版)2025,Vol.11Issue(1):150-162,13.DOI:10.17775/CSEEJPES.2021.06500
Restoration of High-renewable-penetrated Distribution Systems Considering Uncertain Repair Workloads
Restoration of High-renewable-penetrated Distribution Systems Considering Uncertain Repair Workloads
摘要
关键词
Implicit decision rule/non-anticipativity/renewable energy/repair crew/restorationKey words
Implicit decision rule/non-anticipativity/renewable energy/repair crew/restoration引用本文复制引用
Xiaotian Sun,Haipeng Xie,Zhaohong Bie,Gengfeng Li..Restoration of High-renewable-penetrated Distribution Systems Considering Uncertain Repair Workloads[J].中国电机工程学会电力与能源系统学报(英文版),2025,11(1):150-162,13.基金项目
This work was supported in part by the Science and Technology Project of State Grid Corporation of China(SGJX0000KXJS900322). (SGJX0000KXJS900322)