摘要

Abstract

Under the"Dual Carbon"goals,China is accelerating the construction of large-scale wind and solar power generation bases in the Gobi and desertification land.The inherent randomness and volatility of wind and solar power outputs introduce significant uncertainties and the risk of load shedding for the operation of the bases in the Gobi and desertification land and their external transmission systems.Traditional ultra-high voltage direct current(UHVDC)power curve formulation and transmission-storage collaborative planning methods are inadequate for the power delivery from the bases in the Gobi and desertification land.Therefore,this paper proposes a typical UHVDC transmission power curve set construction method firstly,addressing the uncertainty of wind and solar power output.Furthermore,this paper introduces a system load shedding risk quantification index that based on conditional value-at-risk(CVaR)theory and develops a transmission-storage collaborative planning model tailored to the bases in the Gobi and desertification regions.Finally,a case study is conducted on the wind-solar-thermal-storage integrated power generation base in the Gobi and desertification land.The results demonstrate that the proposed method effectively accommodates diverse wind-solar output scenarios and maximizes the renewable energy utilization,thereby validates the feasibility and effectiveness the proposed approach.

关键词

沙戈荒基地/特高压直流/输电功率曲线/条件风险价值理论/输-储协同规划

Key words

bases in the Gobi and desertification land/UHVDC/transmission power curve/theory of CVaR/transmission-storage collaborative planning

分类

动力与电气工程

引用本文复制引用

孙一丁,王千辰,谢忱峥,郭国栋,刘栋,孙英云..计及特高压直流输电特性的沙戈荒基地输-储协同规划方法[J].电力建设,2025,46(3):72-84,13.

基金项目

This work is supported by National Key Research and Development Program of China(No.2023YFB2405900). 国家重点研发计划项目(2023YFB2405900) (No.2023YFB2405900)