| 注册
首页|期刊导航|工业微生物|城镇污水厂多级AO工艺调试运行的应用研究

城镇污水厂多级AO工艺调试运行的应用研究

王伟波

工业微生物2025,Vol.55Issue(1):61-64,4.
工业微生物2025,Vol.55Issue(1):61-64,4.DOI:10.3969/j.issn.1001-6678.2025.01.019

城镇污水厂多级AO工艺调试运行的应用研究

Application Research on the Commissioning and Operation of Multi-stage AO Process in Urban Sewage Treatment Plants

王伟波1

作者信息

  • 1. 上海海滨污水处理有限公司,上海 200120
  • 折叠

摘要

Abstract

The biochemical treatment process plays an important role in denitrification and phosphorus removal in wastewater treatment.During the operation of the tri-stage AO process in the sewage treatment plant,closing the A3 inlet valve and internal reflux valve of the third stage AO will not affect the effluent standard of the sewage treatment plant.At the same time,the total nitrogen concentration in the effluent can be reduced from 8.00~11.0 mg/L to 5.00~9.00 mg/L,and the total nitrogen removal rate can also be improved to a certain extent,which can achieve the purpose of optimizing operation,reducing costs and increasing efficiency.

关键词

多级AO/进水阀门/内回流阀门/出水达标

Key words

multi-stage AO/inlet valve/internal reflux valve/the effluent meets the standard

引用本文复制引用

王伟波..城镇污水厂多级AO工艺调试运行的应用研究[J].工业微生物,2025,55(1):61-64,4.

工业微生物

1001-6678

访问量8
|
下载量0
段落导航相关论文