河南水利与南水北调2025,Vol.54Issue(1):48-50,3.
浅埋覆土输水隧洞盾构施工技术的应用研究
Application Research on Shield Construction Technology for Shallow-Buried Water Conveyance Tunnel Project
杨建新1
作者信息
- 1. 山西中部引黄水务集团有限公司,山西 吕梁 033000
- 折叠
摘要
Abstract
By studying the application of shield method in shallow covered conveyance tunnel,the schemes of earth backfill and uplift pile are put forward to address the insufficient thickness of covering layer.The settlement displacement and stress are determined based on finite element simulation.During the construction process,all links were strictly controlled and safety monitoring was carried out.The results indicate that the ground settlement is 3.1 mm,the radial convergence is 2.2 mm,and the vault settlement is 2.7 mm,which are all within the safe range.The research results provide technical reference for similar projects,and promote the application and development of shield technology in tunnel project construction.关键词
盾构法/浅埋覆土/输水隧洞/变形缝/安全监测Key words
shield technology/shallow covering soil/water conveyance tunnel/deformation joint/safety monitoring分类
建筑与水利引用本文复制引用
杨建新..浅埋覆土输水隧洞盾构施工技术的应用研究[J].河南水利与南水北调,2025,54(1):48-50,3.