| 注册
首页|期刊导航|红水河|双江口水电站洞式溢洪道进口布置与配筋研究

双江口水电站洞式溢洪道进口布置与配筋研究

张凤财

红水河2025,Vol.44Issue(1):8-12,5.
红水河2025,Vol.44Issue(1):8-12,5.DOI:10.3969/j.issn.1001-408X.2025.01.002

双江口水电站洞式溢洪道进口布置与配筋研究

Inlet Layout and Reinforcement of Tunnel-Spillway in Shuangjiangkou Hydropower Station

张凤财1

作者信息

  • 1. 中国电建集团成都勘测设计研究院有限公司,四川 成都 610072
  • 折叠

摘要

Abstract

There are three faults in the inlet slope of the tunnel-spillway of Shuangjiangkou Hydropower Station,which cut each other to form a typical"steep-gentle"combined slip mode,which seriously affects the layout of the spillway inlet.Based on the characteristics and layout conditions of spillway,the author analyzes the defects of guide wall shape and pier design,and explores reasonable reinforcement of sluice chamber.The results show that the elliptical straight wall guide wall has more advantages in the design of ultra-short guide wall with a length of no more than 15 m;Combined with the calculation of eccentric compression members and the finite element calculation results of the joint continuum model of pier and bedrock,it is more economical and reasonable to determine the reinforcement of pier;When calculating the reinforcement of the fan-shaped steel bars in the pier,the thrust is 0.2 times of the thrust of the working arc gate with reference to similar engineering experience,but the rationality of the value needs to be further verified.The research results can be used as reference for similar projects.

关键词

洞式溢洪道/进口布置/三维约束效应/配筋/双江口水电站

Key words

tunnel-spillway/inlet layout/three-dimensional constraint effects/reinforcement/Shuangjiangkou Hydropower Station

分类

建筑与水利

引用本文复制引用

张凤财..双江口水电站洞式溢洪道进口布置与配筋研究[J].红水河,2025,44(1):8-12,5.

红水河

1001-408X

访问量0
|
下载量0
段落导航相关论文