红水河2025,Vol.44Issue(1):72-76,5.DOI:10.3969/j.issn.1001-408X.2025.01.015
广西贵港抽水蓄能电站设计洪水分析计算
Design Flood Calculation of Guigang Pumped Storage Power Station in Guangxi
钟德泽1
作者信息
- 1. 中国能源建设集团广西电力设计研究院有限公司,广西 南宁 530007
- 折叠
摘要
Abstract
Due to the complex influencing factors of design flood in small watersheds and the lack of measured flood data,the accuracy of design flood results is difficult to grasp.Taking Guigang Pumped Storage Power Station in Guangxi as an example,this paper studies the determination method of design flood,analyzes and adopts various applicable methods to calculate the design flood,and determines the design flood results after comprehensive analysis.The results show that it is more reasonable and safer to use the reasoning formula method to calculate the design flood for power stations with small basin area,large slope and single underlying surface conditions.The research results can provide reference for the analysis and calculation of design flood in similar small watersheds.关键词
设计洪水/计算/小流域/贵港抽水蓄能电站Key words
design flood/calculation/small watershed/Guigang Pumped Storage Power Station分类
水利科学引用本文复制引用
钟德泽..广西贵港抽水蓄能电站设计洪水分析计算[J].红水河,2025,44(1):72-76,5.