海洋开发与管理2024,Vol.41Issue(10):155-162,8.
海底修复在埕岛油田动平台插桩就位的应用
Application of Seabed Remediation Technology to Pile Placement on the Jack-Up in Chengdao Oilfield
摘要
Abstract
In order to reduce the risk of the moving platform being in place in the area of repeat-ed pile insertion and extraction in Chengdao Oilfield,the uneven seabed formed by repeated pile insertion and extraction is repaired through seabed topography and geomorphology investigation,plan-ning of treatment scope and depth,selection of suitable machinery for construction,positioning construction,prognosis analysis,etc.Through case analysis,this seabed repair can increase the depth of pile shoes entering the mud,reduce the risk of sliding piles and puncture on the moving platform.关键词
海底修复/埕岛油田/动平台/地形地貌调查/就位风险Key words
Seabed remediation/Chengdao oilfield/Jack-up/Topographic and geomorphologic survey/Position risk分类
海洋科学引用本文复制引用
张达,吕明喜,翟文琦,林增勇,安涛..海底修复在埕岛油田动平台插桩就位的应用[J].海洋开发与管理,2024,41(10):155-162,8.基金项目
山东博士后科学基金资助(SDBX2023071). (SDBX2023071)