海堤水毁修复工程板桩挖沉施工方案应用分析

陈玉珍 于雷 乔梁

江苏水利Issue(3):34-38,5.
江苏水利Issue(3):34-38,5.

海堤水毁修复工程板桩挖沉施工方案应用分析

Application Analysis of the digging and sinking sheet piles construction scheme in the seawall water damage repair project

陈玉珍 1于雷 2乔梁1

作者信息

  • 1. 滨海县水利建筑工程总公司,江苏 盐城 224500
  • 2. 滨海县通榆河河堤管理所,江苏 盐城 224500
  • 折叠

摘要

Abstract

Due to reasons such as coastline erosion,relatively low engineering design standards in the past,and long term seawater erosion,the seawall project in Binhai County has some sections that are significantly affected by wind and waves.Therefore,it is necessary and urgent to repair and strengthen the seawall protection project on the north side of Fanshen River in Binhai County(pile No.28+818~30+068).By taking into account factors such as construction characteristics and construction costs,a suitable construction scheme is selected through comprehensive comparative analysis to ensure the project's effectiveness.And at the same time,the construction quality objectives can also be achieved after taking corresponding measures.Up to now,the repair and strengthening project has been completed for more than five years.Having withstood the tests of five flood seasons,it is operating well and effectively protecting the lives and property of the people on the inner side of the seawall.The experience of the tide grabbing construction in this project can provide some reference for future seawall washout restoration and governance projects.

关键词

海堤水毁修复工程/板桩挖沉施工/滨海县

Key words

seawall water damage repair project/digging and sinking sheet piles construction scheme/Binhai County