Due to reasons such as coastline erosion,relatively low engineering design standards in the past,and long term seawater erosion,the seawall project in Binhai County has some sections that are significantly affected by wind and waves.Therefore,it is necessary and urgent to repair and strengthen the seawall protection project on the north side of Fanshen River in Binhai County(pile No.28+818~30+068).By taking into account factors such as construction characteristics and construction costs,a suitable construction scheme is selected through comprehensive comparative analysis to ensure the project's effectiveness.And at the same time,the construction quality objectives can also be achieved after taking corresponding measures.Up to now,the repair and strengthening project has been completed for more than five years.Having withstood the tests of five flood seasons,it is operating well and effectively protecting the lives and property of the people on the inner side of the seawall.The experience of the tide grabbing construction in this project can provide some reference for future seawall washout restoration and governance projects.关键词
海堤水毁修复工程/板桩挖沉施工/滨海县Key words
seawall water damage repair project/digging and sinking sheet piles construction scheme/Binhai County分类
水利科学