摘要
Abstract
EPC projects face a variety of risks due to the long construction period,variable factors such as stakeholders,and intertwined risks,and the risks in the construction phase mainly include construction management,technology,and subcontracting actor risks.In order to evalu-ate the risk of the construction phase of EPC projects and determine the risk factors that general contractors need to pay attention to,this study constructs 30 secondary risk indicators from six dimensions of politics,economy,environment,technology,organization and management,and adopts hierarchical analysis to deeply analyze all levels of risk indicators of EPC projects,and validates it by taking a hospital EPC project as an example.The results show that the construction risk of this hospital EPC project is general risk level,which is consistent with the actual project.At the same time,this paper also proposes systematic strategies for risk response in the construction phase,in order to provide refer-ence for the construction risk evaluation research of EPC projects.关键词
EPC/施工风险/AHP/风险评价Key words
EPC/Construction risk/AHP/Risk assessment分类
建筑与水利