When BIM technology is applied in the construction progress control of super-large single buildings,due to the complexity of the site environment,there is some deviation between the actual situation and the BIM model.This deviation may lead to the inconsistency between the planned schedule and the actual construction schedule,which further increases the complexity of the work and the difficulty of manage-ment.To this end,BIM software is selected to build the project progress model,and the set of progress influencing factors is added to build a systematic progress information model.First,the empowerment method is used to calculate the deviation of the construction progress of each construction project and quantify it.Then,BIM technology is used to timely correct and improve the schedule to ensure the smooth and efficient construction process.Finally,the model was used to verify the significance of the relationship of each path,which met the predetermined crite-ria,and the model fitted well.The experimental results show that the progress control method can achieve a better application effect.关键词
BIM/建筑施工/单体建筑/进度管控Key words
BIM/Building construction/Single building/Progress control分类
建筑与水利