| 注册
首页|期刊导航|起重运输机械|基于Solidworks Simulation的装船机臂架梁的加固

基于Solidworks Simulation的装船机臂架梁的加固

严小冲

起重运输机械Issue(4):84-88,5.
起重运输机械Issue(4):84-88,5.

基于Solidworks Simulation的装船机臂架梁的加固

严小冲1

作者信息

  • 1. 秦皇岛港股份有限公司 秦皇岛 066000
  • 折叠

摘要

Abstract

The B1Z loader at the port has been in service for an extended period,during which its steel structure has been continuously subjected to impact loads,particularly serious rust and corrosion at the junctions of the boom's truss structure.Additionally,the prolonged exposure to the coastal seawater environment has had a significant influence on the steel structure,leading to a reduction in its effective thickness.To prevent potential fatigue-induced deformation of ship loaders'boom,the boom frame beam has been modeled using SolidWorks software.Subsequently,the fatigue yield deformation of the boom frame beam was simulated and analyzed with the Simulation finite element module.Based on analysis results,susceptible areas of the boom frame beam on the ship loader were reinforced.Stress testing of the repaired section under heavy loads demonstrated a reduction in concentrated stress,confirming that the desired repair effect can be achieved by effectively integrating theoretical knowledge with application.

关键词

装船机/臂架梁/钢结构/SolidWorks Simulation/加固

Key words

ship loader/boom beam/steel structure/SolidWorks Simulation/strengthening

分类

交通工程

引用本文复制引用

严小冲..基于Solidworks Simulation的装船机臂架梁的加固[J].起重运输机械,2025,(4):84-88,5.

起重运输机械

1001-0785

访问量8
|
下载量0
段落导航相关论文