重大水电工程EPC项目采购管理的适应性创新
Adaptive Innovation of Procurement Management for Major Hydropower EPC Projects
摘要
Abstract
As a core link in the implementation of major hydropower projects under the EPC mode,procurement is crucial to the realization of design intent and the smooth implementation of the project.Under the relatively low level of standardization in the domestic construction mar-ket and the application level of EPC mode,there is an urgent need to carry out the adaptive innovation of procurement management in combi-nation with the complex characteristics of major hydropower EPC projects.This study primarily analyzed the motivation of procurement man-agement innovation in major hydropower EPC projects from the importance and complexity of the procurement task itself,and the issue of double entrustment agency of the procurement subject in the implementation process.On this basis,according to the general principle of im-plementing procurement by category and subject,the procurement goods of major hydropower projects were divided into four categories of le-veraged goods,strategic goods,general goods and bottleneck goods based on Kraljic model.Based on the characteristics of the procurement of different categories of goods,the procurement management innovation path was proposed.The case studies of the two projects show that the differentiated procurement management mode is beneficial to the owner in controlling the quality and cost of the main equipment and materi-als,and improves the procurement efficiency while helping the project to be completed with high quality.关键词
项目采购管理/重大水电工程/EPC/Kraljic模型/适应性创新/实施路径Key words
project procurement management/major hydropower projects/EPC/Kraljic model/adaptive innovation/implementation path分类
建筑与水利引用本文复制引用
丁继勇,程星莉,李啟常,丁竹青..重大水电工程EPC项目采购管理的适应性创新[J].人民黄河,2025,47(3):146-152,7.基金项目
国家自然科学基金资助项目(72471085) (72471085)
安徽省自然科学基金"水科学"联合基金资助项目(2208085US19) (2208085US19)