四川水力发电2025,Vol.44Issue(1):5-6,56,3.DOI:10.20196/j.cnki.scslfd.20250102
金沙江银江水电站导流明渠截流方案的优化与实施
Optimization and Implementation of Diversion Channel Closure Scheme for Yinjiang Hydropower Project on Jinsha River
严瑞平 1向前伟 2杨显东1
作者信息
- 1. 攀枝花华润水电开发有限公司,四川 攀枝花 617067
- 2. 四川川投能源股份有限公司,四川 成都 610044
- 折叠
摘要
Abstract
The Yinjiang Hydropower Project is located in the main urban area of Panzhihua City in the middle reaches of the Jinsha River,with an installed capacity of 390MW.At 19:08 on November 18,2024,the diver-sion channel of Yinjiang Hydropower Project was successfully cut off.This diversion overcame the difficulties of limited diversion conditions,deep diversion water,smooth open channel bottom plate,difficult outflow con-trol of upstream hydropower projects,and difficult on-site material preparation.With the careful organization of the project construction unit and the active cooperation of all participating units,the diversion open channel was successfully cut off by optimizing the diversion material preparation and implementation plan,laying a solid foundation for the realization of the power generation target of the first unit of the hydropower project.关键词
银江水电站/导流明渠截流/城市主城区/方案/攀枝花市Key words
Yinjiang Hydropower Project/Diversion channel closure/Urban main area/Scheme/Panzhihua分类
水利科学引用本文复制引用
严瑞平,向前伟,杨显东..金沙江银江水电站导流明渠截流方案的优化与实施[J].四川水力发电,2025,44(1):5-6,56,3.