| 注册
首页|期刊导航|四川水力发电|城市型水电站建设征地移民安置方式和安置标准研究

城市型水电站建设征地移民安置方式和安置标准研究

陈俊勇 周军 马恒臻

四川水力发电2025,Vol.44Issue(1):38-40,65,4.
四川水力发电2025,Vol.44Issue(1):38-40,65,4.DOI:10.20196/j.cnki.scslfd.20250109

城市型水电站建设征地移民安置方式和安置标准研究

Research on the Resettlement Methods and Standards for Land Acquisition and Resettlement of Urban Yinjiang Hydropower Project

陈俊勇 1周军 1马恒臻2

作者信息

  • 1. 攀枝花华润水电开发有限公司,四川 攀枝花 617067
  • 2. 长江勘测规划设计研究有限责任公司,湖北 武汉 430010
  • 折叠

摘要

Abstract

The Yinjiang Hydropower Project on the Jinsha River is the only large-scale urban hydropower pro-ject under construction in China.Due to its construction land being mainly located in the central area of the cit-y,it is completely different from other hydropower projects.It mainly involves more urban residents,more en-terprises and institutions,more municipal infrastructure,and has a significant impact on urban spatial planning.There are significant differences in the resettlement methods,compensation and subsidy standards,resettlement standards,enterprise processing,and professional project processing compared to traditional hydropower pro-jects.This article takes Yinjiang Hydropower Project as the analysis object,and conducts research on the re-settlement methods,resettlement standards,and compensation subsidy standards for urban type hydropower projects.

关键词

城市主城区/银江水电站/建设征地/攀枝花市/移民/安置

Key words

Main urban area/Yinjiang Hydropower Project/Construction land acquisition/Panzhihua City/Im-migration/Resettlement

分类

建筑与水利

引用本文复制引用

陈俊勇,周军,马恒臻..城市型水电站建设征地移民安置方式和安置标准研究[J].四川水力发电,2025,44(1):38-40,65,4.

四川水力发电

1001-2184

访问量5
|
下载量0
段落导航相关论文