四川水力发电2025,Vol.44Issue(1):49-52,4.DOI:10.20196/j.cnki.scslfd.20250112
巨型灯泡贯流式机组全水头运行研究
Research on Full-head Operation of Giant Bulb Tubular Units
卜天郧 1徐孝刚 2孙万庆 1汪从政 1张祝年3
作者信息
- 1. 攀枝花华润水电开发有限公司,四川 攀枝花 617000
- 2. 攀枝花华润水电开发有限公司,四川 攀枝花 617000||四川川投能源股份有限公司,四川 成都 610044
- 3. 四川川投能源股份有限公司,四川 成都 610044
- 折叠
摘要
Abstract
The bulb turbine generator units have a large unit overcurrent and good operational stability.It can a-chieve dual adjustment of guide vanes and blades by adjusting the operating angle of the impeller blades,and can adapt to relatively large changes in water head.It can also operate stably below a water head of 3 meters.The units of Yinjiang Hydropower Project have the potential to optimize ultra-low head operation.Through comprehensive research on the hydraulic design,electromagnetic scheme,cooling technology,bearing structure,unit stiffness and strength,and fatigue life of the units,it is possible to participate in flood discharge and full-head operation at extremely low heads,obtain greater power generation benefits,and solve the problem of slightly high pressure pulsation under high head and low load conditions.It has important significance and pro-motion value in the application field of bulb tubular units.This paper describes the research process on full-head operation of giant bulb tubular units.关键词
灯泡贯流式水轮发电机组/全水头/运行/关键技术/研究/银江水电站Key words
Bulb turbine generator units/Full-head/Operation/Key technologies/Research/Yinjiang Hydropow-er Project分类
建筑与水利引用本文复制引用
卜天郧,徐孝刚,孙万庆,汪从政,张祝年..巨型灯泡贯流式机组全水头运行研究[J].四川水力发电,2025,44(1):49-52,4.