摘要

Abstract

This paper analyzes that,after the Guolangqiao Hydropower Project with annual regulating capacity was put into operation in the Lianghekou to Ganxipo reach of the Tianquan River,the impact of the water stor-age delivery by joint operation of Jiaojiping Hydropower Project and Guolangqiao Hydropower Project on the operating efficiency of the Jiaojiping Hydropower Project.Based on the analysis and research on the power generation,water inflow,operation and maintenance of Jiaojiping Hydropower Project over the years and the effect of the Guolangqiao Hydropower Project after its operation,some rationalized countermeasures and sug-gestions are put forward to improve the current operation states for the purpose of reducing electricity loss,in-creasing electricity during dry season,optimizing the electricity ratio during flood and dry season,optimizing the use of high electricity price and reducing operation and maintenance costs.

关键词

脚基坪水电站/经济效益/锅浪跷水电站/联合运行

Key words

Jiaojiping Hydropower Project/Economic benefits/Guolangqiao Hydropower Project/Joint opera-tion