四川水力发电2025,Vol.44Issue(1):158-163,6.DOI:10.20196/j.cnki.scslfd.20250134
锅浪跷水电站砂石加工系统建设经验与教训
Experience and Lessons Learned from the Construction of Sand and Stone Processing System of Guolangqiao Hydropower Project
柳启超 1伍舰1
作者信息
- 1. 四川二滩国际工程咨询有限责任公司,四川 成都 611130
- 折叠
摘要
Abstract
Due to the inadequacy of the preliminary planning and design of the sand and gravel processing sys-tem of Guolangqiao Hydropower Project,there are a series of problems restricting the production of sand and gravel aggregate during the operation of the system after its completion,such as the lack of bedding production line,rice stone production line and waste water treatment system.This paper introduces the construction and operation of the sand and gravel system,the existing problems and the treatment of related problems.The rel-evant experience and lessons are summarized.It is hoped that it can play a role of reference and warning to the construction of sand and gravel processing system in hydropower projects.关键词
砂石加工/垫层料/米石加工生产线/废水处理系统Key words
Sand and stone processing/Cushion material/Stone production line/Wastewater treatment system分类
天文与地球科学引用本文复制引用
柳启超,伍舰..锅浪跷水电站砂石加工系统建设经验与教训[J].四川水力发电,2025,44(1):158-163,6.