锅浪跷水电站砂石加工系统建设经验与教训

柳启超 伍舰

四川水力发电2025,Vol.44Issue(1):158-163,6.
四川水力发电2025,Vol.44Issue(1):158-163,6.DOI:10.20196/j.cnki.scslfd.20250134

锅浪跷水电站砂石加工系统建设经验与教训

Experience and Lessons Learned from the Construction of Sand and Stone Processing System of Guolangqiao Hydropower Project

柳启超 1伍舰1

作者信息

  • 1. 四川二滩国际工程咨询有限责任公司,四川 成都 611130
  • 折叠

摘要

Abstract

Due to the inadequacy of the preliminary planning and design of the sand and gravel processing sys-tem of Guolangqiao Hydropower Project,there are a series of problems restricting the production of sand and gravel aggregate during the operation of the system after its completion,such as the lack of bedding production line,rice stone production line and waste water treatment system.This paper introduces the construction and operation of the sand and gravel system,the existing problems and the treatment of related problems.The rel-evant experience and lessons are summarized.It is hoped that it can play a role of reference and warning to the construction of sand and gravel processing system in hydropower projects.

关键词

砂石加工/垫层料/米石加工生产线/废水处理系统

Key words

Sand and stone processing/Cushion material/Stone production line/Wastewater treatment system