四川水力发电2025,Vol.44Issue(1):168-172,5.DOI:10.20196/j.cnki.scslfd.20250136
"一洞双机"水电站上游调压室涌浪水位控制方法实践
Practice of Control Method of Surge Water Level in Upstream Surge Chamber of Hydropower Project With"One Tunnel and Dual Units"
李泉 1黄鑫 1黄金山1
作者信息
- 1. 雅砻江流域水电开发有限公司,四川 成都 610051
- 折叠
摘要
Abstract
The unit capacity,total installation machine scale and reference flow of a hydropower are relatively large with ultra long water diversion development,and the utilization water head is relatively high.The pressure difference during the transition process of the upstream surge chamber is relatively high,the surge attenuation is slower,and the hydraulic conditions are extremely complex.The method of operation of the project shall fol-low the hydraulic transient law of hypropower projects with long distance diversion and the principle of"safety and stability".To ensure the safe operation of hydraulic structures and power grids,this article studies the pe-riodic characteristics of water level fluctuations in the surge chamber of a long diversion tunnel caused by single unit load rejection tests and emergency load adjustment in case of accidents,proposed a method to adjust the u-nit load based on the fluctuation of surge water level in the upstream surge chamber.关键词
调压室/浪涌/水位波动Key words
Upstream surge chamber/Surge/Water level fluctuation分类
信息技术与安全科学引用本文复制引用
李泉,黄鑫,黄金山.."一洞双机"水电站上游调压室涌浪水位控制方法实践[J].四川水力发电,2025,44(1):168-172,5.