土木工程与管理学报2025,Vol.42Issue(1):74-80,7.DOI:10.13579/j.cnki.2095-0985.2025.20240199
光伏幕墙BIM模型完整性判断机制研究
Research on Integrity Judgment Mechanism for BIM of Photovoltaic Curtain Wall
摘要
Abstract
The completeness and accuracy of BIM for photovoltaic curtain wall significantly impact BIM application efficiency and quality.This study proposes a judgment mechanism for the complete-ness of BIM of photovoltaic curtain wall.Firstly,by analyzing the physical logic of photovoltaic curtain wall system and the general BIM standard,the completeness rules of BIM including the dual require-ments of relationship chains and component information are defined.Secondly,utilizing Revit second-ary development technology,an automated inspection method for BIM of photovoltaic curtain wall is proposed,and a completeness inspection system for BIM is developed.Case studies demonstrate that the method can effectively identify potential issues in the BIM of photovoltaic curtain wall,ensuring that the connection relationship between each component is correct and meets the completeness re-quirements of BIM information.The research not only optimizes the review process for photovoltaic curtain wall BIM design outcomes but also provides an effective basis for BIM completeness assess-ment,serving as a valuable reference for BIM quality research in other engineering categories.关键词
光伏幕墙/建筑信息模型/二次开发/完整性检查Key words
photovoltaic curtain wall/building information modeling/secondary development/integ-rity check分类
建筑与水利引用本文复制引用
周建亮,程蕾,景慧情,郝梦雅,周杰..光伏幕墙BIM模型完整性判断机制研究[J].土木工程与管理学报,2025,42(1):74-80,7.基金项目
国家自然科学基金(72171224) (72171224)
教育部人文社科规划基金(19YJAZH122) (19YJAZH122)