| 注册
首页|期刊导航|云南水力发电|夏季温控混凝土生产过程试验

夏季温控混凝土生产过程试验

沈凡莉 梁皓

云南水力发电2025,Vol.41Issue(3):51-54,4.
云南水力发电2025,Vol.41Issue(3):51-54,4.DOI:10.3969/j.issn.1006-3951.2025.03.014

夏季温控混凝土生产过程试验

Summer Temperature Controlled Concrete Production Process Test

沈凡莉 1梁皓1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

In order to meet the casting strength requirements of summer dam concrete at a water conservancy hub supporting project site,on-site tests were conducted on the temperature control and production control of its concrete mixing plant.The actual production situation of temperature controlled concrete in summer after the mixing plant reached its production capacity was simulated,and theoretical guidance was provided for production based on the simulation situation and system test results,achieving good results.

关键词

温控/混凝土/拌和楼/现场测试

Key words

temperature control/concrete/mixing plant/field testing

分类

建筑与水利

引用本文复制引用

沈凡莉,梁皓..夏季温控混凝土生产过程试验[J].云南水力发电,2025,41(3):51-54,4.

云南水力发电

1006-3951

访问量3
|
下载量0
段落导航相关论文