| 注册
首页|期刊导航|云南水力发电|某水库泄洪洞体型优化模型试验研究

某水库泄洪洞体型优化模型试验研究

董建虎 刘悦

云南水力发电2025,Vol.41Issue(3):55-59,5.
云南水力发电2025,Vol.41Issue(3):55-59,5.DOI:10.3969/j.issn.1006-3951.2025.03.015

某水库泄洪洞体型优化模型试验研究

Experimental Study on Optimization Model of Spillway Tunnel Shape in a Reservoir

董建虎 1刘悦2

作者信息

  • 1. 山东一招项目管理有限公司,山东 济南 250000
  • 2. 易采通(山东)项目管理咨询有限公司,山东 济南 250000
  • 折叠

摘要

Abstract

In the design and construction of water conservancy projects,spillway tunnels play an important role in releasing excessive floods and ensuring the safe operation of the project.This study takes the spillway tunnel of a certain reservoir as the engineering background,analyzes the structural design problems of the original design scheme through physical model experiments,and proposes specific optimization solutions.The model test results show that the optimized design scheme can effectively improve the flow state of the discharged water,and the optimization effect is good.It is recommended to use it in engineering design.

关键词

泄洪洞/体型优化/模型试验/流态/掺气

Key words

spillway tunnel/body shape optimization/model testing/flow state/blended air

分类

建筑与水利

引用本文复制引用

董建虎,刘悦..某水库泄洪洞体型优化模型试验研究[J].云南水力发电,2025,41(3):55-59,5.

云南水力发电

1006-3951

访问量2
|
下载量0
段落导航相关论文