| 注册
首页|期刊导航|云南水力发电|新疆錾高水电站大流量压力前池甩负荷水力特性试验

新疆錾高水电站大流量压力前池甩负荷水力特性试验

罗昌辉

云南水力发电2025,Vol.41Issue(3):69-73,5.
云南水力发电2025,Vol.41Issue(3):69-73,5.DOI:10.3969/j.issn.1006-3951.2025.03.018

新疆錾高水电站大流量压力前池甩负荷水力特性试验

Hydraulic Characteristics Test of the Large-Flow-Rate Pressure Forepool under Load Rejection at Xinjiang Zangao Hydropower Station

罗昌辉1

作者信息

  • 1. 新疆维吾尔自治区水利水电勘测设计研究院,新疆 乌鲁木齐 830000
  • 折叠

摘要

Abstract

Zangao Hydropower Station project is a high flow diversion type power station,with a designed channel flow of 375.6m3/s and a total bus length of 8.6km.The project has a large scale and a long channel route.In the case of emergency shutdown due to load shedding in the power station,it is difficult to achieve simultaneous closure of the control gates at the head of the diversion canal.Therefore,the emergency shutdown generates water hammer waves that form surges in the forebay and the continuous inflow of the diversion channel will cause the water level in the forebay to rise.If the water level exceeds the front pool wall,it will threaten the safety of the factory building.The purpose of the load rejection test is to determine the highest surge water level in each working condition of the forebay,and to determine the superelevation of the connected pressure forebay water delivery system,in order to make the design of the pressure forebay and water delivery system as safe,reliable,and economically reasonable as possible.

关键词

引水式电站/模型试验/压力前池/侧堰

Key words

water diversion power station/model testing/pressure forebay/side weir

分类

建筑与水利

引用本文复制引用

罗昌辉..新疆錾高水电站大流量压力前池甩负荷水力特性试验[J].云南水力发电,2025,41(3):69-73,5.

基金项目

国家自然基金项目(52068041) (52068041)

云南水力发电

1006-3951

访问量6
|
下载量0
段落导航相关论文