管网工程人工清障施工方法

朱家俊

云南水力发电2025,Vol.41Issue(3):114-117,4.
云南水力发电2025,Vol.41Issue(3):114-117,4.DOI:10.3969/j.issn.1006-3951.2025.03.029

管网工程人工清障施工方法

Construction Method for Manual Obstacle Removal in Pipeline Engineering

朱家俊1

作者信息

  • 1. 云南省滇中引水二期工程有限公司,云南 昆明 650000
  • 折叠

摘要

Abstract

According to regional geological data and surrounding site geological survey reports,the main strata distributed from top to bottom within 10 meters of a certain pipeline network project are:plain fill,silty clay,and fine sand.However,during the actual process of sinking the well on site,it was found that there were rock blocks backfilled and large isolated stones about 3 meters underground.It is necessary to manually clear the obstacles before carrying out the pipe jacking construction to ensure the smooth achievement of the construction goals.This article provides a demonstration effect for accumulating construction experience in manual obstacle clearance in the later stage.

关键词

管网工程/顶管/人工清障/施工方法

Key words

pipeline engineering/top pipe/artificial obstacle clearance/construction method