Abstract

In hydraulic engineering,it is necessary to calculate the energy consumption during the construction period of the project and compare the energy consumption indicators.But currently,most calculations only use rough estimates and budget statistics to convert the total amount of electricity,gas,and diesel used,and cannot evaluate individual indicators.By analyzing and calculating the quantity of individual projects,the energy consumption indicators of each project can be intuitively reflected,meeting the energy consumption calculation during the construction period in energy-saving design of water conservancy projects.Taking various construction projects in actual engineering as an example,conventional construction methods are used to configure construction equipment,hydraulic engineering budget quotas are used to calculate mechanical shifts,and corresponding models of equipment energy consumption are used to calculate the various energy consumed by each project.The total energy consumption required for a project is calculated and converted into conventional energy consumption indicators such as standard coal through energy conversion.The calculation results can be directly used to evaluate the energy consumption indicators of construction methods,and can be used as a comparison of energy consumption for different construction methods in different projects,and to calculate the energy consumption of the entire construction period of a project.According to the annual construction intensity,the energy consumption for each year can be calculated.The calculation method can be refined to each construction project in a project and can be classified and summarized.

关键词

水利工程/施工期/能耗/挖掘机/汽油/柴油/标准煤/定额标准

Key words

water conservancy engineering/construction period/energy consumption/excavating machinery/gasoline/diesel fuel/standard coal/quota standard