| 注册
首页|期刊导航|云南水力发电|某灌区改造工程中35/10kV户内变电站设计方案研究

某灌区改造工程中35/10kV户内变电站设计方案研究

冯杨

云南水力发电2025,Vol.41Issue(3):145-148,194,5.
云南水力发电2025,Vol.41Issue(3):145-148,194,5.DOI:10.3969/j.issn.1006-3951.2025.03.036

某灌区改造工程中35/10kV户内变电站设计方案研究

Research on the Design Scheme of 35/10kV Indoor Substation in a Irrigation District Renovation Project

冯杨1

作者信息

  • 1. 盐城市水利勘测设计研究院有限公司,江苏 盐城 224002
  • 折叠

摘要

Abstract

A medium-sized irrigation area is a fourth level pumping station irrigation project.After years of operation,the electrical equipment in the irrigation area has not been timely and updated,and some have become obsolete products.The electrical equipment is severely aging,accidents occur frequently,and safe operation is not guaranteed,which seriously affects the efficiency of the pumping station.To address the issues with the electrical system in the irrigation area,update and redesign the electrical system.This paper focuses on the design scheme of 35/10kV indoor substation,including substation site,type,selection of main transformer,electrical wiring,power system,lighting,automation,and secondary circuit design of the substation,providing technical reference for this project and similar projects.

关键词

中型灌区/更新改造/存在的问题/变电站设计/方案研究

Key words

medium-sized irrigation area/renewal and renovation/existing problem/substation design/scheme research

分类

信息技术与安全科学

引用本文复制引用

冯杨..某灌区改造工程中35/10kV户内变电站设计方案研究[J].云南水力发电,2025,41(3):145-148,194,5.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文