| 注册
首页|期刊导航|云南水力发电|地铁区间隧道上跨既有引水隧洞建设风险评估模拟分析

地铁区间隧道上跨既有引水隧洞建设风险评估模拟分析

黄一国

云南水力发电2025,Vol.41Issue(3):199-202,4.
云南水力发电2025,Vol.41Issue(3):199-202,4.DOI:10.3969/j.issn.1006-3951.2025.03.049

地铁区间隧道上跨既有引水隧洞建设风险评估模拟分析

Simulation Analysis of Risk Assessment for the Construction of Existing Diversion Tunnels Crossing over Subway Section Tunnels

黄一国1

作者信息

  • 1. 深圳市原水有限公司技术部,广东 深圳 518000
  • 折叠

摘要

Abstract

The paper takes the Biling Tunnel of the Dongjiang Water Source Project in the Anliang Station to Xikeng Station section of Shenzhen Urban Rail Transit Line 16 Phase Ⅱ as the research object.Based on a comprehensive analysis of the construction environment,shield tunneling method was adopted for construction,and steel plates are used to reinforce the inner lining of the tunnel defects.MidaT was used for excavation simulation analysis of the Biling Tunnel section,and two-dimensional mechanical analysis was conducted using Lizheng software.The maximum vertical settlement displacement value of the water supply tunnel was found to be 0.68mm,which is lower than the limit requirement of 10mm additional vertical displacement during the operation period in relevant specifications.Based on this,water supply safety analysis was carried out.

关键词

地铁隧道/供水工程/数值模拟/风险评估

Key words

subway tunnel/water supply engineering/numerical simulation/risk assessment

分类

建筑与水利

引用本文复制引用

黄一国..地铁区间隧道上跨既有引水隧洞建设风险评估模拟分析[J].云南水力发电,2025,41(3):199-202,4.

云南水力发电

1006-3951

访问量8
|
下载量0
段落导航相关论文