| 注册
首页|期刊导航|中国资源综合利用|高风险区域资源开发过程中地质灾害诱发机制试验分析

高风险区域资源开发过程中地质灾害诱发机制试验分析

闫巍 潘安邦 闫平均 令瑞 刘明鑫

中国资源综合利用2025,Vol.43Issue(2):112-114,3.
中国资源综合利用2025,Vol.43Issue(2):112-114,3.DOI:10.3969/j.issn.1008-9500.2025.02.032

高风险区域资源开发过程中地质灾害诱发机制试验分析

Experimental Analysis of Geological Hazard Induction Mechanism in the Process of Resource Development in High-Risk Areas

闫巍 1潘安邦 1闫平均 2令瑞 1刘明鑫1

作者信息

  • 1. 湖北省地质局水文地质工程地质大队,湖北 荆州 434020||湖北省地质局 资源与生态环境地质湖北省重点实验室,武汉 430034
  • 2. 湖北省地质局第四地质大队,湖北 咸宁 437000
  • 折叠

摘要

Abstract

The main types of geological hazards induced by resource development are analyzed systematically,including unstable body instability,rapid movement of loose solid material,underground mining induced type,and underground excavation induced type.The key process of geological hazard induction mechanism testing is emphasized,including site selection,monitoring equipment layout,and data analysis and evaluation.Through a case study of a coal resource development zone in Shanxi Province,the composite driving mechanism of"mining induced stress driven damage+groundwater seepage driven creep+dynamic load disturbance triggering"is revealed,providing scientific basis for the safe implementation of resource development projects in high-risk areas.

关键词

高风险区域/资源开发/地质灾害/诱发机制

Key words

high-risk areas/resource development/geological hazards/induction mechanism

分类

天文与地球科学

引用本文复制引用

闫巍,潘安邦,闫平均,令瑞,刘明鑫..高风险区域资源开发过程中地质灾害诱发机制试验分析[J].中国资源综合利用,2025,43(2):112-114,3.

中国资源综合利用

1008-9500

访问量5
|
下载量0
段落导航相关论文