| 注册
首页|期刊导航|电工技术学报|考虑多供电层级耦合的中低压配电网分布式光伏承载力一体化精细评估方法

考虑多供电层级耦合的中低压配电网分布式光伏承载力一体化精细评估方法

王守相 尹孜阳 赵倩宇

电工技术学报2025,Vol.40Issue(6):1930-1944,15.
电工技术学报2025,Vol.40Issue(6):1930-1944,15.DOI:10.19595/j.cnki.1000-6753.tces.240337

考虑多供电层级耦合的中低压配电网分布式光伏承载力一体化精细评估方法

A Precise Distributed PV Hosting Capability Evaluation Method for MV and LV Distribution Network Considering the Coupling of Multiple Power Supply Layers

王守相 1尹孜阳 1赵倩宇1

作者信息

  • 1. 天津大学智能电网教育部重点实验室 天津 300072||电力系统仿真控制天津市重点实验室 天津 300072
  • 折叠

摘要

Abstract

With the continuous advancement of the national"Carbon Peaking and Carbon Neutrality"strategy,the connection demand of the distributed photovoltaic(DPV)to the distribution network(DN)has been substantially increased.However,the disorderly access of DPV often exceeds the hosting capacity of DNs,leading to safety risks.To promote the high-quality development of DPV,the National Energy Administration pointed out in the"implementation plan for the pilot assessment of grid hosting capacity for distributed photovoltaic access and enhancement measures"released in June 2023 that it is necessary to assess the DPV's open capacity station by station,line by line,and substation by substation,according to different supply levels.However,this plan needed to provide specific calculation and assessment methods.Effectively conducting the current status assessment of DPV hosting capacity in DNs across multiple supply levels and calculating the hosting capacity are urgent problems.Therefore,this paper considers the coupling relationships between supply levels and proposes a simple and efficient method for assessing hosting capacity. Firstly,based on the power supply scope,the DN can be divided into three supply levels:supply substation areas,feeders,and substations.For the three levels,the development status of DPV in the DN is evaluated from five aspects,including DPV capacity penetration rate,DPV energy penetration rate,DPV power export rate,DPV local consumption rate,and curtailment rate.These five evaluation indicators,derived from load data and DPV generation data at different supply levels,comprehensively assess of the DPV generation status in different supply areas.Taking the energy penetration rate as an example,if it is 100%,it may seem like a balance between supply and demand.However,if the load is entirely at night,the local consumption rate of DPV power would be 0,which is not a good state for DPV development. Secondly,an assessment indicator system is constructed for DPV local consumption capability at different supply levels.This system includes source-load power balance,DPV consumption space,and capacity margin.Subsequently,considering the export power limitation of the supply levels,an assessment indicator system for DPV acceptance capability is proposed,which includes DPV acceptance space and capacity margin.After determining the DPV consumption margin and acceptance margin,the lower and upper limits of the DPV hosting potential at different supply levels can be identified.This,in turn,guides the DPV access planning for the DN. The above assessment and calculation of DPV hosting potential do not consider the constraints for the safe operation of the system.Therefore,this paper adopts a segmented bidirectional linear approximation method for acceptance capacity verification based on the calculated results of acceptance capability.When verifying the acceptance capability of a multi-supply level DN,the influence of integrating large-scale DPV into higher supply levels is extensive and significantly impacts the lower-level DN.Consequently,this paper conducts verification in descending order of supply levels.The process moves to the next lower supply level's verification after completing the acceptance capacity verification for all supply areas within a supply level. The main contributions of this paper are as follows.(1)This paper proposes a DPV assessment indicator system for DN supply areas,which can comprehensively and intuitively reflect the DPV development status in different supply regions.(2)A two-stage method for assessing the DPV hosting capacity of supply areas is proposed based on historical operational data,providing a reference for the assessment of DPV's openable capacity.(3)A method for verifying the DPV acceptance capability is proposed,considering the coupling of multiple supply levels.Compared to traditional single-level assessment methods,the proposed method effectively avoids the DPV generation losses caused by aggressive DPV hosting capacity assessments.

关键词

配电网/分布式光伏/接纳能力/消纳能力

Key words

Distribution network/distributed photovoltaic/acceptance capacity/consumption capacity

分类

信息技术与安全科学

引用本文复制引用

王守相,尹孜阳,赵倩宇..考虑多供电层级耦合的中低压配电网分布式光伏承载力一体化精细评估方法[J].电工技术学报,2025,40(6):1930-1944,15.

基金项目

国家自然科学基金资助项目(52077149). (52077149)

电工技术学报

OA北大核心

1000-6753

访问量0
|
下载量0
段落导航相关论文