| 注册
首页|期刊导航|电力系统自动化|面向用电碳计量的备用碳表系统优化配置方法

面向用电碳计量的备用碳表系统优化配置方法

郭魁星 李姚旺 何晓宜 刘恒 李雪城 张宁

电力系统自动化2025,Vol.49Issue(6):14-22,9.
电力系统自动化2025,Vol.49Issue(6):14-22,9.DOI:10.7500/AEPS20240613008

面向用电碳计量的备用碳表系统优化配置方法

Optimal Configuration Method for Backup Carbon Meter System for Carbon Measurement of Electricity Consumption

郭魁星 1李姚旺 2何晓宜 3刘恒 4李雪城 4张宁2

作者信息

  • 1. 清华大学电机工程与应用电子技术系,北京市 100084
  • 2. 清华大学电机工程与应用电子技术系,北京市 100084||清华四川能源互联网研究院,四川省 成都市 610213
  • 3. 清华四川能源互联网研究院,四川省 成都市 610213
  • 4. 国网北京市电力公司,北京市 100031
  • 折叠

摘要

Abstract

The electric carbon meter system is an important carrier for realizing real-time and accurate electric carbon measurement.With the deeply implement of the goal of carbon emission peak and carbon neutrality,the requirements for the accuracy and continuity of measurement by electric carbon meter become increasingly stringent.It will be difficult to cope with the increasing requirements only by relying on an independent carbon meter system,and it is urgent to explore the optimal configuration method for the backup carbon meter system.Considering the characteristics of"one hair affecting the whole body"of the electric carbon measurement and the strong coupling relationship between the electric carbon measurement and the power flow,this paper proposes an optimal configuration method of the backup carbon meter system.The method is conducted in a stepwise optimization manner.First,to ensure that the carbon meter system can measure the complete carbon information of the power system,this paper proposes an optimal method to determine the number of backup carbon meter devices with the minimum configuration cost.Then,with the aim of minimizing the measurement error of the backup carbon meter system,this paper proposes a method of optimizing the distribution of backup carbon meter devices.Finally,the simulation test is carried out based on the PJM 5-bus system and the actual power system data of one city in China.The simulation results show that the proposed method can achieve a carbon emission measurement error of less than 0.2%with the minimum configuration cost of the backup carbon meter system,on the premise of ensuring the complete carbon emission information measurement of the power system.

关键词

低碳电力系统/电碳计量/电力碳表系统/碳排放

Key words

low-carbon power system/electric carbon measurement/electric carbon meter system/carbon emission

引用本文复制引用

郭魁星,李姚旺,何晓宜,刘恒,李雪城,张宁..面向用电碳计量的备用碳表系统优化配置方法[J].电力系统自动化,2025,49(6):14-22,9.

基金项目

国家电网有限公司总部科技项目(5700-202411271A-1-1-ZN). This work is supported by State Grid Corporation of China(No.5700-202411271A-1-1-ZN). (5700-202411271A-1-1-ZN)

电力系统自动化

OA北大核心

1000-1026

访问量0
|
下载量0
段落导航相关论文