高电压技术2025,Vol.51Issue(2):547-557,中插1-中插2,13.DOI:10.13336/j.1003-6520.hve.20241064
计及受端电网可信及调峰需求的大型风光储基地运行及规划方法:(一)中长期运行优化
Operation and Planning Method of Large-scale Wind/Solar/Storage Bases Considering Credi-ble Capacity and Peak Regulation of Receiving Power Grids:(1)Medium and Long-term Operation Optimization
摘要
Abstract
As the"dual carbons"(namely,carbon peak and carbon neutrality)goal progresses,the proportion of renewable energy in power grids is expected to increase significantly.Consequently,conventional transmission methods of bases will no longer meet the requirements of receiving grids.To address this issue,a medium-and long-term optimization method for wind/solar/storage bases has been proposed,considering both credible capacity and peak shaving demands of receiv-ing power grids.Regarding credible capacity supply,this method comprehensively considers the credible power supply during annual peak load periods and daily highest net load periods.The power supply capacity of the base is strengthened in these two aspects within base transmission.For participating in the peak shaving of receiving power grids,this method introduces the concept of shared absorption space between wind/solar from both bases and receiving power grids.Base energy storage is utilized to convert wind and solar power output to periods when peak shaving pressure on receiving power grids is minimized.The calculation results demonstrate that the proposed method is adopted to significantly en-hance various transmission benefits for large-scale wind/solar/storage bases and reduce the abandoned power.The proposed model has been validated to maximize the role of base energy storage in ensuring supply reliability and peak shaving needs,thus providing a more suitable base transmission curve for these requirements.关键词
大型可再生能源基地/可信容量/深度调峰/送电优化/风光储基地/消纳空间Key words
large-scale renewable energy base/credible capacity/peak shaving regulation/transmission optimization/wind/solar/storage base/absorption space引用本文复制引用
杨寅平,王绍德,孙英云,曹娅玲,冯艳虹..计及受端电网可信及调峰需求的大型风光储基地运行及规划方法:(一)中长期运行优化[J].高电压技术,2025,51(2):547-557,中插1-中插2,13.基金项目
国家重点研发计划(2023YFB2405900).Project supported by National Key R&D Program of China(2023YFB2405900). (2023YFB2405900)