陕西煤炭2025,Vol.44Issue(3):164-168,5.DOI:10.20120/j.cnki.issn.1671-749x.2025.0330
误差传播理论在地下贯通工程测量中的应用研究
Application of error propagation theory in underground penetration engineering survey
石磊 1刘修刚 2郭建磊2
作者信息
- 1. 中国神华能源股份有限公司神东煤炭分公司,陕西 榆林 719315
- 2. 中煤科工西安研究院(集团)有限公司,陕西 西安 710077
- 折叠
摘要
Abstract
In order to improve the accuracy of the breakthrough point in underground engineering,the indirect adjustment method with constraint conditions is adopted,that is,a constraint condition is added in the adjustment,so that the proportion of horizontal and vertical errors of ground control points to through points is equal.Under the principle of least squares,the ground control network is adjusted to obtain the coordinate values of the ground control points after adjustment.And this method was applied to a practice.The results show that the coordinates of the control points change after the additional con-straint adjustment,and the penetration error of the control points to the breakthrough points is increased by 20%after the change,so as to ensure the quality and safety of the underground breakthrough project.关键词
地下工程/贯通测量/贯通点误差/附加约束条件的间接平差/最小二乘原则Key words
underground engineering/through measurement/through point error/indirect adjustment method with constraint/least square method分类
交通工程引用本文复制引用
石磊,刘修刚,郭建磊..误差传播理论在地下贯通工程测量中的应用研究[J].陕西煤炭,2025,44(3):164-168,5.