Railway Sciences2025,Vol.4Issue(2):P.141-158,18.DOI:10.1108/RS-12-2024-0053
Improving lateral track strength after ballast maintenance
Stephen Wilk 1Dingqing Li2
作者信息
- 1. Department of Rail Infrastructure,MxV Rail,Pueblo,Colorado,USA
- 2. Department of Engineering,MxV Rail,Pueblo,Colorado,USA
- 折叠
摘要
关键词
Lateral track strength/Single tie push test(STPT)/Track buckle/Tamping/Shoulder width/Crib height分类
交通工程引用本文复制引用
Stephen Wilk,Dingqing Li..Improving lateral track strength after ballast maintenance[J].Railway Sciences,2025,4(2):P.141-158,18.